Generator Hire for Data Centres and IT Infrastructure Projects

Data centres and IT infrastructure facilities depend on a reliable electricity supply. Servers, networking equipment, cooling systems, security systems and supporting services all require carefully managed power to operate. Even planned electrical work can create challenges if the facility needs to maintain selected operations while upgrades or maintenance are carried out.

Temporary generator power can be considered as part of a wider power management plan. It may support construction and fit-out work, electrical upgrades, testing activities or temporary operational requirements. However, supplying power to an IT environment requires detailed planning because different systems have different electrical demands and continuity requirements.

This guide explains how generator hire may support data centre and IT infrastructure projects, what should be considered when assessing temporary power requirements and how businesses can prepare before arranging equipment.

Why Data Centres May Require Temporary Power

A data centre’s electrical infrastructure is designed to support equipment that operates continuously or according to specific operational schedules. The permanent power arrangement may include incoming utility supplies, backup systems, distribution equipment and uninterruptible power supply (UPS) systems.

There are several situations where temporary power may need to be considered.

Common examples include:

  • Electrical infrastructure upgrades.
  • Installation of new server rooms or technical areas.
  • Building refurbishment and expansion projects.
  • Generator replacement or maintenance activities.
  • Electrical testing and commissioning.
  • Temporary power requirements during construction and fit-out.
  • Additional power for project equipment and temporary facilities.

The exact requirement depends on the work being carried out. A construction contractor installing new infrastructure may need temporary electricity for tools, lighting and site facilities. An operational data centre may have a different requirement involving carefully controlled electrical arrangements.

These applications should not be treated as interchangeable. The project team needs to establish precisely which equipment requires power and whether the temporary supply is intended for construction activities, testing or operational continuity.

Supporting Data Centre Construction and Fit-Out

Developing or expanding a data centre involves several stages. These may include building work, electrical installation, mechanical services, equipment delivery and commissioning.

During construction, the permanent electrical infrastructure may not be ready to support all project activities. Temporary generator hire can provide an alternative source of electricity for suitable construction and installation loads.

Potential applications include:

  • Temporary site lighting.
  • Power for suitable construction equipment.
  • Temporary offices and welfare facilities.
  • Electrical tools used during installation.
  • Selected commissioning activities.
  • Temporary services in areas awaiting permanent connections.

Before selecting a generator, contractors should identify the equipment that will operate from the temporary supply. The total electrical demand, operating pattern and connection requirements should be reviewed.

The installation should also be coordinated with the wider construction programme. This helps the project team identify when temporary power will be required, where the equipment can be positioned and how cables will reach the intended loads.

Temporary Power During Electrical Upgrades

Electrical upgrades can involve distribution boards, switchgear, cabling and other infrastructure. In some cases, sections of an electrical system may need to be isolated while work takes place.

For an operational IT facility, any change to the electrical supply needs careful coordination. A temporary generator may be considered as part of an engineered arrangement, but it should never be assumed that a hired generator can simply replace an existing supply or automatically maintain critical operations.

The facility’s electrical design, UPS configuration, transfer arrangements and protection systems all need to be considered.

Before work begins, the project team should establish:

  1. Which electrical circuits or areas will be affected.
  2. Whether critical loads need to remain operational.
  3. What existing backup and UPS arrangements are in place.
  4. Whether the temporary generator is intended to support operational loads or project equipment.
  5. How the temporary supply will be connected, tested and isolated.
  6. Who is responsible for approving and supervising the electrical arrangement.

Any temporary connection to critical infrastructure must be designed, reviewed and implemented by suitably qualified professionals. Testing should follow the facility’s approved procedures.

Understanding the Electrical Load

Generator selection should always begin with an accurate understanding of the required load. Data centre environments can contain equipment with different electrical characteristics, and the power demand may change as systems are installed or brought online.

The project team should consider the following:

  • Connected equipment: Identify every item that will receive power from the generator, including supporting systems and temporary project equipment.
  • Total demand: Calculate the expected electrical load rather than relying on an approximate estimate of the facility’s overall capacity.
  • Starting requirements: Some equipment may draw additional current during startup. These requirements should be included in the assessment.
  • Load variation: Consider whether equipment operates continuously, intermittently or in stages.
  • Voltage and phase: Confirm the electrical supply requirements of the connected equipment and the proposed distribution arrangement.
  • Future project stages: If additional equipment will be connected later, establish whether the temporary arrangement needs to accommodate those changes.

It is important to distinguish between the total capacity of a facility and the specific load that a temporary generator is expected to supply. A generator should be selected for the intended application, with appropriate technical review.

Gen-Rent UK offers generator hire in capacities from 30–2,000kVA, subject to availability and project requirements. The suitable option will depend on the load assessment and the conditions of the installation.

Planning Distribution and Cable Requirements

A generator is only one part of a temporary power arrangement. The distribution equipment and cables must also be appropriate for the electrical load, installation conditions and connection points.

Data centre projects may involve temporary distribution across construction areas, plant rooms, technical spaces and external work zones. Cable selection and routing should therefore be considered early in the planning process.

The project team should check:

  • Required cable ratings and conductor sizes.
  • Single-phase or three-phase requirements.
  • Cable lengths and connection locations.
  • Suitable distribution panels and junction boxes.
  • Protection and isolation arrangements.
  • Cable routes through busy or restricted areas.
  • Measures to prevent mechanical damage.

Gen-Rent UK’s cables and distribution range includes LV single- and three-phase multicore cables up to 125A, LV single-core cables up to 240mm and MV single-core cables up to 240mm. Its range also includes LV distribution panels, LV junction boxes up to 3000A, Luggit cable joints, Litton Power-Lock converters up to 240mm cable and MV junction boxes up to 600A.

The appropriate equipment must be selected according to the project design and electrical requirements. Cables should not be chosen based on physical size or availability alone.

Generator Positioning at Data Centre Sites

The location of temporary generator equipment can affect access, safety and the wider project programme. Data centre sites may have controlled entry points, restricted delivery routes and areas where noise or exhaust emissions need particular consideration.

Before delivery, contractors should identify a suitable generator position and check the following:

  • Space available for the equipment.
  • Access for delivery and removal vehicles.
  • Ground conditions and the proposed installation surface.
  • Safe ventilation and exhaust discharge.
  • Distance from building air intakes and occupied areas.
  • Noise restrictions and nearby sensitive locations.
  • Security and access control.
  • Safe routes for electrical cables.

Generator equipment should be installed in accordance with the manufacturer’s instructions and applicable site requirements. Exhaust gases must be discharged safely, and the equipment must not be operated in an unsuitable enclosed or poorly ventilated area.

The proposed location should also allow authorised personnel to carry out inspections and operating checks without interfering with normal site activities.

Fuel Planning and Operating Periods

Temporary power planning should include an assessment of how long the generator is expected to operate and when electricity will be required.

A generator used for construction equipment may have a different operating pattern from one supporting a defined testing activity. Some projects may require power during normal working hours, while others may involve extended operating periods.

Before work begins, the project team should confirm:

  • Expected daily operating hours.
  • Total project duration.
  • Whether operation will be continuous or intermittent.
  • Fuel arrangements and access requirements.
  • Responsibility for monitoring and operating checks.
  • Procedures for responding to an equipment issue.

These details help establish the practical requirements of the installation. Fuel arrangements should be managed safely and in accordance with relevant site procedures and equipment instructions.

Safety and Operational Coordination

Temporary generator installations at data centre sites require coordination between electrical contractors, facility managers, project managers and other relevant personnel.

The installation should be assessed before equipment is connected. Particular attention should be given to electrical protection, earthing, isolation, cable condition and the compatibility of the temporary supply with the intended equipment.

A suitable project plan should also cover access restrictions, emergency arrangements, equipment security and communication between the teams involved.

Where temporary power may affect critical systems, the facility’s approved change-management and maintenance procedures must be followed. No connection or switching activity should take place without the required technical approval.

Choosing Generator Hire for an IT Infrastructure Project

Hiring a generator may be worth considering when a project needs temporary power for a defined period. It can provide access to equipment without requiring a business to purchase a generator that may not be needed after the project finishes.

Before contacting a hire provider, prepare the key project information:

  • Intended application and equipment to be powered.
  • Estimated electrical load.
  • Voltage and phase requirements.
  • Required operating hours.
  • Project start date and expected duration.
  • Proposed generator location.
  • Delivery access and site restrictions.
  • Any distribution equipment or cable requirements.

Providing accurate information helps the hire provider understand the application and discuss suitable equipment options. The final generator selection and electrical installation should be confirmed by the relevant technical professionals.

Gen-Rent UK provides generator hire for UK businesses and projects, with capacities from 30–2,000kVA, subject to availability and project requirements.

For further information, visit the Gen-Rent UK generator hire or contact the team on 0800 772 3193.

Conclusion

Data centre and IT infrastructure projects can require temporary electricity during construction, fit-out, electrical upgrades and commissioning. Generator hire may provide a practical option for suitable project loads, provided the requirements are assessed and the installation is properly planned.

The most important considerations include electrical load, distribution equipment, cable selection, generator positioning, fuel arrangements and site safety. For operational data centres, any temporary supply involving critical systems must also be supported by an approved engineering design and carefully managed procedures.

With the right preparation, project teams can make informed decisions about temporary generator power and coordinate it more effectively with their wider infrastructure work.